1、WWW.ULSTEIN.COMTURNING VISIONS INTO REALITYSMART O&M BY LARGE OPERATION SHIP大型海上运维船推动海上风电智能运维大型海上运维船推动海上风电智能运维The 4th Global Offshore Wind SummitYang Jiang,Guangdong China02/06/2019WWW.ULSTEIN.COMTURNING VISIONS INTO REALITYULSTEIN 乌斯坦公司介绍乌斯坦公司介绍Family-owned,third generationMore than 100 years exper

2、ience in the maritime industryInnovator in maritime equipment,designs and ships乌斯坦公司成立于乌斯坦公司成立于1917年,总部在年,总部在挪威,分公司分布全球挪威,分公司分布全球5个国家,员个国家,员工人数工人数600人。人。600People5CountriesNorwayMain office UlsteinvikOUR HOME GROUNDWWW.ULSTEIN.COMTURNING VISIONS INTO REALITY海上风电海上风电配套的船舶:配套的船舶:开发规划阶段开发规划阶段Planning&D

3、evelopment拆除拆除Decommissioning 营运营运&维护维护Operations&Maintenance风机安装风机安装Turbine installation&Commissioning基础安装基础安装Foundation installationVessels:Survey&InspectionVessels:Cable lay vessels Rock installation vessels Monohull crane vessels SOVVessels:Jack-up vessels SOVVessels:SOV Cable lay vesselsVessels

4、:Monohull crane vessels Jack-up vessels乌斯坦提供海上风场建乌斯坦提供海上风场建设、营运过程中需要的设、营运过程中需要的所有船型设计和建造。所有船型设计和建造。WWW.ULSTEIN.COMTURNING VISIONS INTO REALITYCrew Transfer VesselMechanic+toolbox交通艇:船员倒班船Service Operations Vessel 运维母船Walk to work 配备动态补偿廊桥Replacing large equipment 更换大型设备Advanced Logistic centre 先进的设备

5、、人员物流中心OFFSHORE WINDMAINTENANCE DEVELOPMENTS海上风场运维的发展海上风场运维的发展WWW.ULSTEIN.COMTURNING VISIONS INTO REALITYADVANTAGES OF EMPLOYING SOVSCredit:F3O Offshore BrokersWWW.ULSTEIN.COMTURNING VISIONS INTO REALITYADVANTAGES OF EMPLOYING SOVSCredit:SIEMENS AGWWW.ULSTEIN.COMTURNING VISIONS INTO REALITYCOMPARISO

6、N BETWEEN SOV&OSVSpecial Personnel work ON the vesselComfort for seamanMainly liquid cargoRig crane is normally the operation bottle-neckSpecial Personnel work OFF the vesselComfort for Special PersonnelUnder-deck storage,more logistic focusW-2-W gangway is normally the operation bottle-neckWWW.ULST

7、EIN.COMTURNING VISIONS INTO REALITYSERVICE OPERATION VESSEL 运维母船运维母船Getting people and equipment to wind turbine Safe Comfortable EfficientWWW.ULSTEIN.COMTURNING VISIONS INTO REALITYCARGO AND PERSONNEL FLOW MAIN DECKTo gangway by elevatorTo workboat by derrick craneTo gangaway by craneLoading zone f

8、or containerWarehouseWorkshopWWW.ULSTEIN.COMTURNING VISIONS INTO REALITYCARGO AND PERSONNEL FLOW A-DECKTo gangway by elevatorTo workboat by craneTo gangway by craneSide loading pallets on A-deck(optional)Mess room areaWorkshopLounge areaWWW.ULSTEIN.COMTURNING VISIONS INTO REALITYLoa:74.0 mBmoulded:1

9、7.0 mTdesign:6.0 mVservice:13.5 knotsMain generators:2 x 1,700+2x 1350 kWPositioning:DP2ULSTEIN SX163-SERVICE OPERATION VESSELWWW.ULSTEIN.COMTURNING VISIONS INTO REALITYLoa:88.0mBmoulded:18.0mTdesign:6.0mVservice:13.5knotsMain generators:4 x 1,700 kWPositioning:DP2Complement:60-90 personsDeck area:3

10、60 m2Deadweight:3,200 tonULSTEIN SX175-SERVICE OPERATION VESSELWWW.ULSTEIN.COMTURNING VISIONS INTO REALITYX-STERN IMPROVE OPERABILITYVarious In-Field Working PattenWWW.ULSTEIN.COMTURNING VISIONS INTO REALITYVESSEL/GANGWAY OPERABILITYOver the new gangway,the technicians arrive atthe turbines around 2

11、85 days a year-despite thehigh tide.With the new gangway,the boarding is possibleup to 2.5 meters of significant wave height.95%of all spare parts for the wind turbines areavailableinfourstoragespacesandsixcontainersGangway can be telescoped up to 23 metersIn waves under 1.2 meters high,captain of“W

12、inder La Cour”can also launch the daughtercraft.WWW.ULSTEIN.COMTURNING VISIONS INTO REALITYLoa:93,4 mBmoulded:18.0 mTdesign:6.0 mVservice:13.5 knotsMain generators:4 x 1,700 kWPositioning:DP2Complement:90-120 personsDeck area:500 m2Deadweight:3,200 tonULSTEIN SX195-SERVICE OPERATION VESSELWWW.ULSTEI

13、N.COMTURNING VISIONS INTO REALITYULSTEIN SX195-SERVICE OPERATION VESSELWWW.ULSTEIN.COMTURNING VISIONS INTO REALITYULSTEIN SX195-SERVICE OPERATION VESSELWWW.ULSTEIN.COMTURNING VISIONS INTO REALITYULSTEIN SX195-SERVICE OPERATION VESSELWWW.ULSTEIN.COMTURNING VISIONS INTO REALITY联系我们联系我们Kolbjrn MoldskredSales manager Ulstein Design&Solutions ASKTel +47 957 22 099Lucy LuMarketing&Sales Director Ulstein ChinaLTel+86 136 7151 6134

友情提示

1、下载报告失败解决办法
2、PDF文件下载后,可能会被浏览器默认打开,此种情况可以点击浏览器菜单,保存网页到桌面,就可以正常下载了。
3、本站不支持迅雷下载,请使用电脑自带的IE浏览器,或者360浏览器、谷歌浏览器下载即可。
4、本站报告下载后的文档和图纸-无水印,预览文档经过压缩,下载后原文更清晰。

本文(1. ULSTEIN-大型海上运维船推动海上风电智能运维 中英文 - 31052019(19页).pdf)为本站 (云闲) 主动上传,三个皮匠报告文库仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对上载内容本身不做任何修改或编辑。 若此文所含内容侵犯了您的版权或隐私,请立即通知三个皮匠报告文库(点击联系客服),我们立即给予删除!

温馨提示:如果因为网速或其他原因下载失败请重新下载,重复下载不扣分。
会员购买
客服

专属顾问

商务合作

机构入驻、侵权投诉、商务合作

服务号

三个皮匠报告官方公众号

回到顶部